Guildford Car Park Demolition

Guildford Park and Ride Car Park

[minti_iconbox iconimg=”17295″ style=”4″ title=”Demolition” url=”http://matthewsgroup.co.uk/demolition/”][/minti_iconbox]
[minti_iconbox iconimg=”17298″ style=”4″ title=”Earthworks & Enabling Contracts” url=”http://matthewsgroup.co.uk/earthworks-and-landscaping/”][/minti_iconbox]
[minti_iconbox iconimg=”17301″ style=”4″ title=”Haulage” url=”http://matthewsgroup.co.uk/haulage/”][/minti_iconbox]
[minti_iconbox iconimg=”17299″ style=”4″ title=”Muck Away & Waste Disposal” url=”http://matthewsgroup.co.uk/muck-away-waste-disposal/”][/minti_iconbox]
[minti_iconbox iconimg=”17303″ style=”4″ title=”Plant Hire” url=”http://matthewsgroup.co.uk/plant-hire/”][/minti_iconbox]
[minti_iconbox iconimg=”17376″ style=”4″ title=”Soil Remediation & Validation” url=”http://matthewsgroup.co.uk/soil-remediation-sussex/”][/minti_iconbox]
[minti_headline size=”fontsize-m” weight=”fontweight-400″ lineheight=”lh-13″ transform=”transform-uppercase” margin=”10px 0 0 0″]Muck Away & Waste Disposal • Demolition • Earthworks & Enabling Contracts • Haulage • Plant Hire • Soil Remediation & Validation[/minti_headline][minti_headline size=”fontsize-l” weight=”fontweight-800″ margin=”0 0 10px 0″]Call us now on 01293 617014[/minti_headline]
[minti_headline type=”h3″ size=”fontsize-l” color=”#f36e32″ weight=”fontweight-600″ transform=”transform-uppercase” align=”align-left”]Client: Balfour Beatty[/minti_headline][minti_headline type=”h3″ size=”fontsize-m” color=”#0b4855″ weight=”fontweight-600″ align=”align-left” margin=”0 0 10px 0″]Site: Guildford Park and Ride Car Park
[/minti_headline][minti_spacer]

Project Overview

Construction of new access road, new car park and landscape area.

[minti_spacer]

Project Considerations

The new car park area and access road had to be cleared of trees, bushes etc and removed from site. The existing topsoil of 4300m3 was then excavated and placed in permanent stockpiles for future re-use with only approximately a few hundred metres to be re-used on site in island planters etc.

Reduce level excavation of 29900m3 across the site undertaken followed by the preparation of formation to falls and cross falls, 11200m3 of suitable material was used to make up levels prior to the formation being prepared ; 1900m3 of material was transported to permanent on site landscape areas with the remaining surplus of 16800m3 being removed from site to our company owned disposal facility.

Type one sub base was then placed to the roads and new car parking area.

Drainage, kerbs and tarmac undertaken by other specialist contractors.

All work undertaken by our own site management team, labour plant and equipment.

[minti_spacer]

Scope of Works

  • Site clearance
  • Excavation
  • Placement of suitable fill on site
  • Placement of type 1 sub base
  • Preparation of sub formation
  • Removal of surplus material from site
  • Deposition of fill to landscape areas
[minti_spacer height=”20″]
[minti_spacer height=”20″][minti_image img=”17157″][minti_image img=”17158″][minti_imagebox style=”2″]

Call us now on 01293 617014 to discuss a project

[minti_spacer height=”15″]

[minti_button link=”mailto:[email protected]” size=”large” target=”” lightbox=”false” color=”color-2″ icon=”fa-chevron-right” appear=”true”]Email Us Here[/minti_button]

[/minti_imagebox][minti_divider style=”2″ margin=”0 0 40px 0″][minti_imagebox]

Click below to view more Recent Projects

[minti_spacer height=”4″]

[minti_button link=”http://matthewsgroup.co.uk/case-studies/” size=”large” target=”” lightbox=”false” color=”color-3″ icon=”fa-chevron-right” appear=”true”]View Recent Projects[/minti_button]

[/minti_imagebox]

No Comments

Sorry, the comment form is closed at this time.