Muck Away Balham

Balham

[minti_iconbox iconimg=”17295″ style=”4″ title=”Demolition” url=”http://matthewsgroup.co.uk/demolition/”][/minti_iconbox]
[minti_iconbox iconimg=”17298″ style=”4″ title=”Earthworks & Enabling Contracts” url=”http://matthewsgroup.co.uk/earthworks-and-landscaping/”][/minti_iconbox]
[minti_iconbox iconimg=”17301″ style=”4″ title=”Haulage” url=”http://matthewsgroup.co.uk/haulage/”][/minti_iconbox]
[minti_iconbox iconimg=”17299″ style=”4″ title=”Muck Away & Waste Disposal” url=”http://matthewsgroup.co.uk/muck-away-waste-disposal/”][/minti_iconbox]
[minti_iconbox iconimg=”17303″ style=”4″ title=”Plant Hire” url=”http://matthewsgroup.co.uk/plant-hire/”][/minti_iconbox]
[minti_iconbox iconimg=”17376″ style=”4″ title=”Soil Remediation & Validation” url=”http://matthewsgroup.co.uk/soil-remediation-sussex/”][/minti_iconbox]
[minti_headline size=”fontsize-m” weight=”fontweight-400″ lineheight=”lh-13″ transform=”transform-uppercase” margin=”10px 0 0 0″]Muck Away & Waste Disposal • Demolition • Earthworks & Enabling Contracts • Haulage • Plant Hire • Soil Remediation & Validation[/minti_headline][minti_headline size=”fontsize-l” weight=”fontweight-800″ margin=”0 0 10px 0″]Call us now on 01293 617014[/minti_headline]
[minti_headline type=”h3″ size=”fontsize-l” color=”#f36e32″ weight=”fontweight-600″ transform=”transform-uppercase” align=”align-left”]Client: Taylor Wimpey[/minti_headline][minti_headline type=”h3″ size=”fontsize-m” color=”#0b4855″ weight=”fontweight-600″ lineheight=”lh-14″ align=”align-left”]Site: Industrial Laundry Factory, Balham, South West London[/minti_headline][minti_headline type=”h3″ size=”fontsize-s” color=”#0b4855″ weight=”fontweight-600″ lineheight=”lh-14″ align=”align-left” margin=”0 0 30px 0″]Works to be undertaken: Demolition, Muck Away of Material[/minti_headline]

Project Overview

The site was located in an extremely sensitive area and bordered densely populated residential areas on 3 sides with the fourth side bordering a major railway line.

Project Considerations

This presented a challenge as to how best to safely demolish the 35mtr chimney.

This was accomplished by the erection of a working scaffold, followed by the progressive deconstruction of the chimney by hand. The chimney and scaffolding tower were in the ‘Failure Radii’ of the adjacent operational railway lines and therefore works approval needed to be sought from Network Rail before commencement. Following a number of meetings with Network Rail representatives a safe plan of works was created. Due to the sensitivities of the Network Rail land no deviation could be made to how the works were undertaken.

Scope of Works

  • Assume the role of Principle Contractor
  • Establish adequate site welfare facilities
  • Carry out pre-condition survey
  • Demolish superstructure
  • Bulk excavation and muck away of surplus materials
  • Leave site in a clean, tidy and safe condition on completion
[minti_image img=”16928″]
[minti_image img=”16926″][minti_image img=”16927″][minti_spacer height=”20″][minti_imagebox style=”2″]

Call us now on 01293 617014 to discuss a project

[minti_spacer height=”15″]

[minti_button link=”mailto:[email protected]” size=”large” target=”” lightbox=”false” color=”color-2″ icon=”fa-chevron-right” appear=”true”]Email Us Here[/minti_button]

[/minti_imagebox][minti_divider style=”2″ margin=”0 0 40px 0″][minti_imagebox]

Click below to view more Recent Projects

[minti_spacer height=”4″]

[minti_button link=”http://matthewsgroup.co.uk/case-studies/” size=”large” target=”” lightbox=”false” color=”color-3″ icon=”fa-chevron-right” appear=”true”]View Recent Projects[/minti_button]

[/minti_imagebox]

No Comments

Sorry, the comment form is closed at this time.